Case study

How a nine week tower project stayed on schedule

Commercial · Chicago

The problem

A 1970s office tower was being repositioned for a new anchor tenant. The original drawings were paper, partially missing and wrong in several places. Two previous survey attempts had produced models the design team refused to use.

What we did

  • Audited the existing scan data and rejected three floors as unusable
  • Arranged a supplementary scan of those floors within a week
  • Modeled architecture and MEP in parallel using two dedicated teams
  • Released floors in batches of four so design work started in week two

The result

Nine weeks end to end

Delivered two days ahead of the agreed date across all 24 floors.

4 mm average deviation

Verified against the registered cloud and reported floor by floor.

Zero rejected floors

Every release was accepted first time by the client BIM manager.

Two change orders avoided

Riser conflicts found in the model rather than on site.

Discuss a project like this
Client feedback

What clients said afterwards

They told us three floors of our scan data were not good enough instead of quietly modeling rubbish. That honesty saved the project.
ALA. LindqvistDevelopment Manager, Real Estate Owner
Sixty two tie ins, every one within tolerance. Our fabricator did not send a single spool back. That has never happened before on a shutdown this size.
PVP. van DijkEngineering Manager, Process Facility
Fourteen buildings, one standard, no arguments about naming. Our estates team can finally compare data across the whole campus.
RCR. ChenEstates Director, University
Start your project

Send your scan data today. Get a quote tomorrow.

Tell us the building, the area and the level of detail you need. We will come back with a fixed price and a firm delivery date within 24 hours.