Nine weeks end to end
Delivered two days ahead of the agreed date across all 24 floors
A 1970s office tower was being repositioned for a new anchor tenant. Two earlier survey attempts had produced models the design team would not touch, so the developer needed a partner who could deliver a usable file, not just a scan converted to shapes.
A 1970s office tower was being repositioned for a new anchor tenant, but the paper drawings on file were incomplete and wrong in several places, and two earlier survey attempts had produced models the design team refused to use.
We audited the existing scan data, rejected three floors with poor coverage and arranged a rescan within a week, then modeled architecture and MEP in parallel using dedicated discipline teams working inside the client Revit template from day one. Floors were released in batches of four so design work could start while later floors were still in production.
The full scope covered 24 floors and two basement levels, with shared coordinates matched to the site survey and a deviation report issued for every release so the client BIM manager could verify accuracy before sign off.
This project combined our architectural scan to BIM and MEP scan to BIM services. See more commercial real estate work on our industry page.
Click any image to view it full screen, or drag to browse. New photos will replace these placeholders.
A clear record of the data that came in and the files that went out.
Delivered two days ahead of the agreed date across all 24 floors
Every release accepted first time by the client BIM manager
Verified against the registered cloud and reported floor by floor
Two failed vendor attempts had already cost the project six weeks before we were engaged. The verified model let the design team begin tenant improvement drawings two months earlier than the recovery plan assumed, directly protecting the developer leasing timeline for the new anchor tenant.
6 weeks of lost schedule recovered inside one quarter
Design work started 2 months ahead of the recovery plan
Anchor tenant leasing timeline protected
“The model came back inside our template with zero warnings. Our design team started work the same day it landed.”
MEP scan to BIM above a live ceiling void, coordinated to plan a plant room replacement without closing wards.
Rack level as built model used to plan a 40 percent capacity expansion without new build.
Structural and services model built to plan a new production line install and equipment routing.
Guides and technical notes from our BIM engineers. Links go live as new posts are published.
Learn how AI and LiDAR support urban planning, smart mobility, mapping, and data-driven city development with real-world applications.
Read article
Explore how Leica RTC360 supports fast site capture, accurate point clouds, and reliable Scan to BIM workflows for complex projects.
Read article
Learn how FARO scanning technology supports Scan to BIM conversion by capturing detailed site data for accurate BIM model development.
Read articleTell us the building, the area and the level of detail you need. We will come back with a fixed price and a firm delivery date within 24 hours.