Clash detection that produces decisions, not a report nobody reads

A raw clash list with 8,000 hits helps nobody. We filter, group and prioritise conflicts into an action list your team can close in a week, then run the meetings to make sure they do.

Named project lead Fixed price, fixed date

Service snapshot

What a typical engagement looks like
SoftwareNavisworks Manage, Solibri, BIM Collaborate
Cycle time3 to 5 days per round
InputsRVT, IFC, NWC, DWG, DGN
DeliverablesNWD, BCF, report, meeting minutes
IncludesChaired coordination sessions
Request pricing for this service

No obligation. Most quotes go out within 24 hours.

Overview

The value is in the filtering, not in the clash count

Any software can generate thousands of clashes. Most are duplicates, tolerance noise or conflicts that resolve themselves on site. Handing that list to a project team just buries the problems that matter.

We tune the rules, group clashes by system and location, remove the noise, and produce a report where every entry is a real decision with an owner and a due date. Coordinating against an existing building starts with an accurate as built model of what is actually there.

  • Rules tuned to your tolerances, not software defaults
  • Clashes grouped by zone, system and responsible party
  • Each item with a screenshot, location and clear owner
  • Coordination meetings chaired to close items fast
Clash matrix · Round 3
Why choose us

Why our clash reports get closed instead of ignored

A report full of noise trains your team to stop reading it. Ours is built to be actioned.

01
60 to 200 real issues, not thousands

Noise filtered before the report reaches you

A raw clash list can show 8,000 hits. We group, dedupe and prioritise so every line item is a decision, not a distraction.

02
Rules tuned per stage

Not left on software defaults

Early rounds run looser to catch layout problems, later rounds tighten to installation tolerance.

03
Meetings chaired by us

On request, at no extra charge

A neutral party running the session keeps it focused on resolution instead of blame.

04
Existing conditions clashed

New design tested against measured reality

We model the existing building from scan data first, so your new design is checked against what is actually there, not an assumed drawing.

What you get

What a coordination round delivers

Everything your team needs to close conflicts without arguing about them.

Federated model

All discipline models linked into one Navisworks file with correct coordinates and clear naming.

Prioritised clash report

Grouped conflicts with severity, location, screenshot, responsible party and suggested resolution.

BCF issue file

Issues exported as BCF so they land directly in each consultant model with the viewpoint attached.

Coordination meetings

Chaired sessions where each item is reviewed live and an owner and date is agreed on the spot.

Progress tracking

Round on round tracking showing what closed, what reopened and what is blocking the next milestone.

Sign off pack

A closeout summary confirming the model is coordinated and ready for the next stage or for construction.

Scope of work

What we check in a coordination review

Rule sets are agreed with your team before the first round runs.

Included in every project

  • Hard clashes between services and structure
  • Clearance clashes against maintenance access zones
  • Ceiling void congestion and coordination space
  • Riser and shaft capacity checks
  • Penetration coordination through slabs and walls
  • Headroom and clear height compliance
  • Plant room access and equipment removal routes
  • Existing conditions against new design
  • Fire compartment and containment integrity
  • Constructability and installation sequence checks
Scope itemWhat we deliverTypical use
Round 1Broad review to find systemic layout problemsEarly design coordination
Round 2Detailed clash testing with tuned tolerancesTechnical design stage
Round 3Zone by zone signoff and closeoutPre construction approval
OngoingChange driven reviews as design developsConstruction stage control
Coordinating new design against an existing building. This is where scan data pays for itself. Clashing new services against a measured as built model finds the conflicts that legacy drawings hide completely.
How it works

How a coordination cycle works

A predictable weekly rhythm that keeps the whole team moving.

Model intake

Discipline models are collected, checked for coordinates and naming, then federated into one file.

Rule setup

Clash rules and tolerances are configured for your project so noise is filtered out from the start.

Test and filter

Tests are run, duplicates removed, and remaining conflicts grouped by zone and system.

Report and meet

The report is issued ahead of a chaired meeting where owners and dates are agreed for every item.

Track and close

Resolutions are verified in the next round and anything reopened is escalated immediately.

Why clients pick us for this

Noise removed

Reports contain decisions, not raw software output.

Meetings chaired

We run the session so items actually close.

Existing conditions

We clash new design against measured reality.

Request a fixed price quote
Case study

Coordinating a live clinic refurbishment out of hours

Healthcare · Dubai

The challenge

A private clinic needed a full refurbishment of its imaging and treatment floors, but the facility could not close, so every new service route had to be coordinated against existing conditions before a single overnight work window was booked.

What we did

We modeled the existing building from scan data, federated it with the new design and ran three rounds of clash detection, chairing coordination meetings that closed each round conflict list before the next overnight session was scheduled.

The result

3 coordination rounds

Reduced the open clash list from over 400 to zero over six weeks

Zero clinic closures

Every survey and review fitted around live patient hours

18 out of hours sessions

Completed on schedule with no rework once work began on site

"Every session started with a shorter list than the last. By the time contractors were on site there was nothing left to argue about."
FAF. Al MansooriProject Director, Healthcare Facility
Questions

Clash Detection questions we hear most

Straight answers so you can scope your project with confidence.

On a first round it is common to see thousands of raw hits. After filtering and grouping, a typical project has 60 to 200 real items that need a decision. That is the list we hand over.

Yes, and we chair them if you want. Someone neutral running the session keeps it focused on resolution rather than on who is at fault.

Yes. We work with Revit, IFC, DWG, DGN and NWC inputs. Mixed platform teams are normal, and IFC handles most of what does not come from Revit.

It depends on the stage and the systems. Early rounds run looser to find layout problems, later rounds tighten to installation tolerances. We agree the numbers with you before starting.

Yes, and it is one of our most requested services. We model the existing building from scan data, then clash your new design against measured conditions rather than assumed ones.

Start your project

Send your scan data today. Get a quote tomorrow.

Tell us the building, the area and the level of detail you need. We will come back with a fixed price and a firm delivery date within 24 hours.