Home
Industries Projects Blog About Contact
Get a Free Quote Call +1 469 887 6400
Heritage · Boston, United States

Mapping a century of weathering before a phased stone repair

A museum needed accurate facade and interior documentation ahead of a phased stone repair programme, but decades of weathering had left cracking and staining that no existing survey had ever mapped systematically.

Project facts

Scope, software and timeline at a glance
LocationBoston, United States
SectorHeritage and culture
ScopeHeritage BIM, condition mapping
Level of developmentLOD 350
SoftwareRevit, rectified imagery
Facade zones mapped6
Access methodGround and elevated scan positions
Delivery time8 weeks
Project overview

Mapping a century of weathering before repairs were priced

A museum needed accurate facade and interior documentation ahead of a phased stone repair programme, but decades of weathering had left cracking and staining that no existing survey had ever mapped systematically.

We modeled the building envelope and key interior spaces from scan data, then produced rectified orthographic elevation images with condition notes mapped directly onto them so the conservation team could specify repairs zone by zone.

Access to upper facade zones was arranged by cherry picker, avoiding the cost and disruption of a full scaffold survey.

This project was delivered through our heritage BIM modeling service. See more heritage and culture work on our industry page.

Project image placeholder Add a site photo or rendered visual for Nineteenth Century Museum
Inputs and deliverables

What we received and what we handed back

A clear record of the data that came in and the files that went out.

Project inputs
  • Ground based and elevated scan positions across 6 facade zones
  • No previous condition survey on file
  • Museum trust repair sequencing priorities
  • Cherry picker access arranged for upper facade zones
Deliverables
  • Facade and interior HBIM model
  • 6 rectified orthographic elevation images
  • Condition mapping and repair priority notes per zone
  • Measured drawing set for the repair specification
  • Baseline record for future condition monitoring
Key outcomes

One document driving the whole repair sequence

6 facade zones mapped

Each with its own condition report and repair priority

No scaffolding required

Full elevation survey completed from ground based and elevated scan positions

8 weeks delivery

From first scan to the final measured drawing and condition set

Business impact

A limited repair budget spent where it matters most first

The museum trust now has a prioritised, evidence based repair sequence instead of reacting to visible damage, letting a limited conservation budget be spent on the zones that need it most first rather than the zones that are simply easiest to see.

Repair budget prioritised by evidence, not guesswork

Baseline condition record established for future monitoring

Supported a phased, budget matched repair programme

“We finally have one document that shows exactly where the stone is failing and in what order to fix it.”
TWT. WhitcombeFacilities Director, Museum Trust
Start your project

Send your scan data today. Get a quote tomorrow.

Tell us the building, the area and the level of detail you need. We will come back with a fixed price and a firm delivery date within 24 hours.