Home
Industries Projects Blog About Contact
Get a Free Quote Call +1 469 887 6400
Industrial and Manufacturing

Scan to BIM for factories, warehouses and process plants

New production lines have to fit around existing services, and a shutdown that runs long costs more than the entire survey. We deliver the accuracy that keeps a shutdown on schedule.

Sector snapshot

What usually drives the brief
Common driverShutdown windows and tie in accuracy
Typical LODLOD 400
Most requestedPiping model and tie in verification
SoftwareRevit, AutoCAD Plant 3D
Request pricing for this sector
Overview

Built for the shutdown clock

In a live plant, a measurement error costs a day of production, not a design change. We model piping, structure and equipment with real measured dimensions and verify every proposed tie in point before fabrication ever starts.

Projects are scheduled backwards from your shutdown date, so verified tie in data reaches your fabricator with time to spare rather than arriving the week before the plant goes down. This is exactly what our plant and industrial scan to BIM service is built for.

Why sector experience matters here

  • Programmes planned backwards from your shutdown date
  • Tie in points measured and reported with coordinates
  • Structural steel and process piping modeled together
  • Experienced working around live, operating facilities
Relevant services

Services industrial and manufacturing teams order most

The services clients in this sector order most often.

Questions

Industrial and Manufacturing questions we hear most

Straight answers so you can scope your project with confidence.

Yes. Tell us the shutdown window at quote stage and we plan the whole programme backwards from it, so verified data reaches your fabricator with time to spare.

Yes, and it is one of the most valuable things we do. Each tie in gets a measured coordinate and a tolerance note, which is what stops a spool arriving short on site.

Yes, working with your safety team on access and any permit to work requirements. Most process facility surveys are completed without stopping production.

Yes. Process piping, steel structure and equipment are modeled together and federated into one coordinated model, since clashes usually happen at the interface between them.

Start your project

Send your scan data today. Get a quote tomorrow.

Tell us the building, the area and the level of detail you need. We will come back with a fixed price and a firm delivery date within 24 hours.