MEP Discipline

MEP scan to BIM that shows exactly what runs above your ceiling

Ceiling voids are where projects go wrong. We model every duct, pipe, tray and hanger as it actually runs, so your new services fit the first time instead of on the third attempt.

Named project lead Fixed price, fixed date

Service snapshot

What a typical engagement looks like
Typical LODLOD 300 to LOD 400
Turnaround5 to 8 days per floor
SoftwareRevit MEP, Navisworks, IFC
DeliverablesRVT, IFC, NWD, DWG
IncludesClash report on request
Request pricing for this service

No obligation. Most quotes go out within 24 hours.

Overview

The most expensive part of a retrofit is the space nobody measured

Legacy MEP drawings show design intent from twenty years ago. Since then, systems were extended, rerouted and patched. The only reliable record is a scan of what is up there right now.

We model services with real diameters, real routes and real clearances, including the hangers and supports that quietly steal the space your new plant needs. MEP models built this way are ready to run straight through clash detection against structure and architecture.

  • Ducts, pipes and trays with true size and route
  • Hangers, supports and brackets included at LOD 350
  • Plant equipment modeled with access and clearance zones
  • System naming and colour coding to your standard
Scan BIM Model

Drag the handle to compare the scan against the finished model

Why choose us

The ceiling void detail most vendors leave out

Missing hangers and clearance data is how a clean looking MEP model still fails on site.

01
Hangers included at LOD 350

Supports modeled, not just the pipe or duct

Hangers and brackets sit exactly where your new services need to fit. Skipping them is how a clash report misses the real problem.

02
Real clearance data

Plant rooms modeled with maintenance access zones

Equipment removal routes and service clearances are checked against the model, not assumed from a layout drawing.

03
System types mapped correctly

Clash rules work without manual regrouping

Ducts, pipes and trays are set up with the correct Revit system types from the start, so Navisworks tests run cleanly.

04
Occupied building experience

Surveyed around live schedules as standard

Hospitals, hotels and operating facilities are normal projects for us, not an exception that slows the programme down.

What you get

What the MEP package delivers

Everything needed to plan a services replacement without a site shutdown.

Coordinated MEP model

Mechanical, electrical, plumbing and fire systems modeled in native Revit MEP categories with correct system types.

Plant room models

Boilers, chillers, AHUs, pumps, tanks and switchgear modeled with maintenance clearance zones marked.

Clearance study

Available void space mapped floor by floor so you know what will and will not fit before design starts.

Service route drawings

Layout drawings per system, generated from the model, ready to issue to your installation team.

Equipment schedule

Every item of plant listed with size, location, service and access notes for the operations team.

Clash report

A Navisworks clash test against the structure and architecture with a prioritised action list.

Scope of work

What we model in the MEP disciplines

Pick the systems that matter to your project and leave the rest out of the price.

Included in every project

  • Supply, return and extract ductwork with fittings
  • Chilled water, heating and condenser pipework
  • Domestic water, drainage and vent stacks
  • Sprinkler mains, branches and head positions
  • Cable trays, ladders, baskets and conduit
  • Electrical panels, busbar and containment
  • Air handling units, fan coils and diffusers
  • Pumps, tanks, boilers, chillers and heat exchangers
  • Hangers, supports, brackets and seismic restraint
  • Access panels, valves and isolation points
Scope itemWhat we deliverTypical use
LOD 300Systems routed with correct size and positionSpace planning and feasibility
LOD 350Supports, hangers and interfaces addedClash detection and coordination
LOD 400Fittings, valves and fabrication detailPrefabrication and spool drawings
Plant roomsEquipment with clearance and access zonesReplacement and maintenance planning
If your project involves replacing plant in an occupied building, ask for the clearance study first. Knowing the tightest point on the removal route often changes which unit you buy.
How it works

How an MEP model is built

Modeled by discipline specialists, then coordinated as one federated set.

System scoping

We agree which systems are in scope, what level of detail each needs, and how they should be named and colour coded.

Main routes first

Primary risers, mains and distribution runs are modeled to establish the spatial framework.

Branch and terminal

Branch runs, terminals, diffusers, sprinkler heads and outlets are added against the cloud.

Supports and plant

Hangers, brackets and plant equipment go in with clearance zones where LOD 350 or higher applies.

Coordinate and check

The MEP model is federated with structure and architecture, clash tested and reviewed before release.

Why clients pick us for this

Real clearances

Supports and hangers modeled, not ignored.

Clash ready

Federates cleanly with structure and architecture.

Live building safe

Experienced with occupied and operational sites.

Request a fixed price quote
Case study

Replacing a plant room without closing a single ward

Healthcare · Manchester

The challenge

A hospital trust needed to replace an aging plant room and reroute several service risers, but the only way to plan the work safely was to know exactly what was running through the ceiling voids above three live wards.

What we did

We modeled ducts, pipes, cable trays and supports above the wards from scan data captured during scheduled ceiling access, then ran a clash test against the proposed new routing so the installation team knew every conflict before mobilising.

The result

Zero ward closures

Survey and modeling completed entirely around the live clinical schedule

3 riser clashes found

Resolved on paper before installation began

7 weeks delivery

From first scan to a coordinated, clash checked MEP model

"The model saved us a shutdown. Three clashes in the riser would have cost us a weekend of rework. They found all of them first."
SKS. KaurProject Director, MEP Contractor
Questions

MEP Scan to BIM questions we hear most

Straight answers so you can scope your project with confidence.

Only where the scanner could see them. We plan the survey with your facility team so tiles are lifted in agreed locations. Anything not scanned is marked as unverified rather than guessed.

At LOD 350 and above, yes. They matter more than most people expect because they take up the exact space where new services usually want to run.

We model both the pipe and the insulation outline where it is visible, since the outer dimension is what governs clearance on site.

Yes. Systems are set up with the correct Revit system types and naming so Navisworks clash rules work without manual regrouping.

Yes. At LOD 400 we include fittings, valves and connection detail suitable for spool drawings and off site fabrication.

Start your project

Send your scan data today. Get a quote tomorrow.

Tell us the building, the area and the level of detail you need. We will come back with a fixed price and a firm delivery date within 24 hours.