| LOD 100 |
Massing boxes, building envelope boundaries, approximate height |
Approximate gross building area |
Feasibility, early zoning, solar studies |
1 - 2 days |
| LOD 200 |
Generic walls, slabs, windows with placeholder dimensions |
Basic room classification |
Space planning, conceptual cost estimates |
3 - 4 days |
| LOD 300 |
Accurate geometry, true wall thicknesses, real door/window openings |
Material types, object classification |
Renovation drawings, building permits, tender sets |
5 - 8 days |
| LOD 350 |
Actual sizes, pipe flanges, cable tray tees, structural connections |
System naming, clear service zones |
Multi-discipline clash coordination, MEP plant rooms |
7 - 12 days |
| LOD 400 |
Fabrication-level spools, custom bracketry, assembly components |
Part numbers, fabrication parameters |
Off-site prefabrication, modular construction |
10 - 15 days |
| LOD 500 |
Field-verified as-constructed elements with deviation sign-off |
Asset tags, maintenance warranty, serials |
Handover, digital twins, CAFM/CMMS operations |
Custom |